G2G Phase 2

Our Campaign for a New Generation of Ministry

Phase 2 of the Generation to Generation Campaign will:

  • Celebrate our ministry of Christian fellowship. We will provide a complete renovation of the fellowship hall and kitchen, adding a small dining room and handicap accessible restrooms.
  • Celebrate our sanctuary as a “house of worship for all.” We will address much-needed deferred maintenance needs in the sanctuary building, including the replacement of HVAC units, all of which are 25-45 years of age, and add two handicap accessible restrooms on the chancel side of the sanctuary level. If funding allows, we will replace sanctuary carpeting and the 25-year old sound system.
  • Celebrate the life-changing ministry of our Child Development Center. We will renovate the CDC for the first time since it opened in 1999. The renovation will include painting, flooring repair, the addition of a toddler restroom, proper storage, and an updated kitchen.
  • Celebrate music and the arts as a robust and necessary part of Christian formation. We will renovate the music wing of the sanctuary building and create space for a rotating display of our extensive collection of Christian art.

Generation to Generation

Generation to Generation. Buildings themselves don’t create ministry. With that in mind, this campaign allows us to prepare space for ministry that is not yet known. Imagine the ministry potential of a newly renovated kitchen and fellowship hall (community gathering space), or the opportunity to create locally grown, “farm to preschool” menus at the CDC, something that a recent health report said is “desperately needed” in early childhood education (USDA, March 2019). We’re setting the stage for that kind of dynamic, faithful ministry … and much more!

The Final Stretch Meetings

Join us for our G2G information meetings, April 18 at 1:30 pm  in the Faith Center and on zoom, and April 21 at 5:30 pm in the same locations.

Our Called Congregation Meeting will be April 25 at 10:30 am in the Faith Center and zoom. At the Congregation Meeting, we will vote on a final construction contract. If approved, construction would begin as soon as possible!